UZIN RK 37 PUR injection adhesive View larger

UZIN RK 37 PUR Injection Adhesive

New product

Size of trading unit: 250g


UZIN RK 37 1-component PUR injection adhesive

Hard, shear-resistant and quick-setting adhesive for repair work

Repairs hollow spots in installed wood flooring, avoids possible reclamations.


UZIN LOGO
   
Lieferung 
Delivery in 2-3 working days in Germany, within EU in 4-6 working days after receiving payment

More details

in Stock

29,90 EUR Tax included

Shipping excluded

119,60 EUR per kg

  • 2 x 250g
  • 250ml

Add to wishlist

Ask about product
UZIN RK 37 PUR Injection Adhesive

UZIN RK 37 PUR Injection Adhesive

Size of trading unit: 250g


UZIN RK 37 1-component PUR injection adhesive

Hard, shear-resistant and quick-setting adhesive for repair work

Repairs hollow spots in installed wood flooring, avoids possible reclamations.


UZIN LOGO
   
Lieferung 
Delivery in 2-3 working days in Germany, within EU in 4-6 working days after receiving payment

I accept privacy policy rules  

UZIN RK 37 


Main area of application:

  • Removal of hollow spots
  • Fixing of individual wood flooring elements or smaller partial areas

Suitable for use on:

  • cementitious screeds, calcium sulphate screeds or concrete
  • substrates with old waterproof adhesives or compound residues adhering to them
  • new and old, firmly screw-fixed chipboard P4 - P7 or OSB/2 - OSB/4 boards
  • existing ceramic and natural stone coverings, Terrazzo or similar
  • new mastic asphalt (screeds)
  • precast screeds, gypsum fibre boards
  • levelling compounds suitable for wood flooring
  • UZIN insulating and installation underlays suitable for wood flooring
  • hot water underfloor heating

Produktvorteile / Eigenschaften

  • Excellent penetration and wetting properties
  • Filling cavities
  • For interior use

Gütesiegel & Kennzeichen

  • GISCODE RU 1 - solvent-free
  • EMICODE EC 1 R PLUS - Very low-emission

   EM
Consumption: depending on the application
Working temperature: min. 15 °C at ground level
Working time: approx. 20 minutes*
Ready for load-bearing: after approx. 6 hours*
Final strenght: after 1-2 days*
* At 20° C and 65 % relative humidity, depending on the type of floor covering and the absorbency of the substrate.
Manufacturer: UZIN

Customers who bought this product also bought:

11 other products in the same category: